HOME PAGE | < Previous | Contents | Next >

Main Machine Installation


2.3 MAIN MACHINE INSTALLATION


2.3.1 ACCESSORY CHECK

Installation

Installation

Installation

Check the quantity and condition of the accessories in the box against the following list:



Description

Q'ty


1

Decal – Energy Save (-91, -61, -17, -57, -18, -58, -27, -67,

-29, -69, -19, -59, -28, -68)


1


2

Rating plate (-17, -18, -19, -21, -27, -28, -29, -57, -58, -59,

-61, -67, -69, -68)


1

3

Decal – VERMONT (-91, -17, -57, -18, -58)

1

4

Model Name Decal (-91, -92, 17, -57)

1

5

Decal – WEEE (-27, -67)

1

6

Main SW Decal

1

7

Decal – Eco Label (-21, -61)

1

8

Decal – Rohs (-21, -61)

1

9

Decal – Rohs date(-21, -61)

1

10

Decal – Certificates (-21, -61)

2

11

Decal – LASERCLASS1 (-19, -59, -28, -68, -21, -61)

1

12

Decal – Impoter (-19, -59)

1

13

Decal – SDK (-57, -58, -67, -69, -59, -68, -61)

1

14

Decal – Caution - Copy

1

15

Emblem Cover

1

16

Emblem

1

17

Decal – Brand

1

18

Warranty (-21, -61)

1

Main Machine Installation



Description

Q'ty

19

Quick Reference Guide – Safety (-27, -67)

1


20

Sheet – Communication management – Blank (-27, -67,

-19, -59)


1


21

Decal – Paper Tray (-91, -17, -57, -18, -58, -27, -67, -29,

-69, -19, -59, -28, -68, -21, -61)


1

22

Decal – Caution – Original (-91, -17, -57, -18, -58)

1

23

Sheet – EMC – Traceability (-27, -67)

1

24

Sheet – Name – Tel (-21, -61)

1

25

Stamp (-91, -17, -57, -18, -58, -)

1

26

Exposure Glass Cleaning Cloth

1

27

Cloth Holder

1

28

Ferrite Core

1


29

Sheet – Exposure Glass (-91, -17, -18, -19, -21, -27, -28,

-29, -57, -58, -59, -61, -67, -69, -68)


1

30

Power Supply Cord

1


31

CD-ROM: Operation Instruction (-91, -92, -17, -18, -21, -27,

-28, -29, -57, -58, -67, -69, -68)


1

32

CD-ROM: Driver (-57, -58, -67, -69, -68)

1

33

CD-ROM: Operation Instruction/Driver (-19, -59, -21, -61)

1


34

Operation Instruction – Read This First

(-91, -92, -17, -18, -19, -21, -27, -29, -57, -58, -59, -61, -67,

-69)


1


35

Operation Instruction – User Guide

(-91, -92, -17, -18, -19, -21, -27, -29, -57, -58, -59, -61, -67,

-69)


1

36

Sheet – EULA (-57, -58, -67, -68, -69, -19, -59, -21, -61)

1

37

Sheet – Caution (-57, -58, -67, -68, -69, -68, -61)

1

 

ACCESSORY CHECKINSTALLATION PROCEDUREPreliminary ProceduresPCDU (Photoconductor and Development Unit)Toner BottlePaper TraysInitialize TD Sensor and DeveloperSet Paper Size for Paper TraysElectrical Total CounterExposure Glass CleanerSettings Relevant to the Service ContractData Overwrite SecurityHDD EncryptionApp 2 Me Setting (SP model only)MOVING THE MACHINETRANSPORTING THE MACHINE