HOME PAGE | < Previous | Contents | Next >

1. REPLACEMENT AND ADJUSTMENT


1.1 SMART OPERATION PANEL


1.1.1 OPERATION PANEL UNIT


Turn off the main power switch of the MFP and disconnect the power cord.

After replacing, make sure that all disconnected harnesses are connected up again and secured in their clamps (if the MFP has harnesses).

image

When handling the operation panel cable, hold down the connector of the cable with your finger as shown in the picture to prevent excessive force from being applied to the connector of the PCB.

image


If excessive force is applied to the connector of the PCB in the direction of the arrow, connection failure may occur.

image

For machines manufactured in October 2016 or later, a bracket [A] will be added to cover the connector of the cable.

image

1. Remove the operation panel unit from the MFP.


For details about how to remove the operation panel unit, refer to the service manual for the MFP.

2. Operation panel arm bracket [A] image×4)


image


By factory default, switches No.3 and No.7 of the DIP switch [A] on the micro computer board are set to ON. When installing the operation panel unit, make sure that the DIP switch setting is correct for the MFP on which you are installing the panel.

image

The correct DIP switch setting depends on the MFP. Note the DIP switch settings of the old operation panel unit before replacing, and apply the same settings to the new Smart Operation Panel. (Below are two examples for DIP switch settings.)


When No.3 and No.7 are set to ON

This is the factory default setting of a service part


When only No.3 is set to ON


image


image


If the DIP switch setting is wrong, SC672 will be displayed.

After replacing the operation panel unit, make sure that the latest version of the firmware is installed on the Smart Operation Panel. Update it if necessary (page 62 "Updating the Smart Operation Panel").

 

OPERATION PANEL UNITCPU BOARDMICRO COMPUTER BOARDWI-FI MODULELCDSPEAKERMICROPHONE