HOME PAGE | < Previous | Contents | Next >
Extended USB Board Type M19 (D3BS-01)
Installation
Installation
Installation
2.25 EXTENDED USB BOARD TYPE M19 (D3BS-01)
2.25.1 ACCESSORY CHECK
No | Items | Q’ty | Remarks |
1 | Extended USB Board | 1 |
2.25.2 INSTALLATION PROCEDURE
When installing this option, turn OFF the main power and unplug the power cord from the wall socket. If installing without turning OFF the main power, an electric shock or a malfunction may occur.
Do not put your hand into the controller box. It will result in a malfunction or injury.
Before doing any work, touch a metal object to discharge static electricity from the body.
1. Remove the slot cover [A].
Extended USB Board Type M19 (D3BS-01)
2. Insert the Extended USB Board into the I/F slot.
3. Turn ON the main power.
4. Check that the system settings list is output, and that the board is recognized correctly.
The customer should keep the slot cover which were removed.