HOME PAGE | < Previous | Contents | Next >

Installation Requirements


2. INSTALLATION


2.1 INSTALLATION REQUIREMENTS



image

Installation

Installation

Installation

Never turn off the main power switch when the power LED is lit or flashing. To avoid damaging the hard disk or memory, press the operation power switch to switch the power off, wait for the power LED to go off, and then switch the main power switch off.

image

Install the machine in a safe place for keeping security.

Make sure that the operation instructions are kept at a customer's hand.


image

The main power LED lights or flashes while the platen cover or ARDF is open, while the main machine is communicating with a facsimile or the network server, or while the machine is accessing the hard disk or memory for reading or writing data.



image

Rating voltage for peripherals: Make sure to plug the cables into the correct sockets.


image


 

ENVIRONMENTMACHINE LEVELMINIMUM SPACE REQUIREMENTSPOWER REQUIREMENTS