HOME PAGE | < Previous | Contents | Next >
2.9.2 INSTALLATION PROCEDURE
Unplug the copier power cord before starting the following procedure.
1. All tapes and shipping retainers.
Installation
Installation
Installation
2. Insert the two stud screws ([A] is the larger stud, [B] is the smaller stud).
3. Mount the ARDF [A] by aligning the screw keyholes [B] of the ARDF support plate over the stud screws.
4. Slide the ARDF toward the front of the machine.
5. Secure the ARDF with the two knob screws [C].
6. Align the rear left corner of the platen sheet [A] with the corner [B] on the exposure glass.
7. Close the ARDF.
8. Open the ARDF and check that the platen sheet is correctly attached.
ARDF DF3090
9. Lift the ARDF original tray.
10. Slide the stamp holder [A] out and install the stamp cartridge in it, if necessary.
After the stamp installation, be sure to slide the holder in correctly. If not, jam detection (J001) will occur.
11. Attach the decals [A] [B] to the top cover as shown. Choose the language that you want.
ARDF DF3090
Installation
Installation
Installation
12. Scanner rear cover [A] ×3)
13. Connect the harness [A].
14.
15.